Main Library: [Notice] Suspension of Automated Retrieval System etc. due to repair work

March 8th, 2019

The work of repairs has been completed earlier than planed. You can use Automated Retrieval System (ARS) after 11am March 22th.

We plan to do work of repairs of the joint of buildings B and C on the 2nd floor.

Suspension of Automated Retrieval System (ARS)Mar. 20th (Wed.) 17:00 ~ Mar. 25th (Mon.) 9:00
The passage blocked between bldg. B and C on the 2nd floor Mar. 20th (Wed.) ~ 24th (Sun.)

※The Library is closed: Mar. 21st (Thu) and 24th (Sun)

the map on the 2nd floor during the repair work

Please go through the passage between bldg. B and C on the 3rd floor to get the materials retrieved via ARS from 9 am to 5pm Mar. 20th.

The work of repairs make noise.

We are sorry for the inconvenience.