March 8th, 2019
We plan to do work of repairs of the joint of buildings B and C on the 2nd floor.
Suspension of Automated Retrieval System (ARS) | |
The passage blocked between bldg. B and C on the 2nd floor |
※The Library is closed: Mar. 21st (Thu) and 24th (Sun)
Please go through the passage between bldg. B and C on the 3rd floor to get the materials retrieved via ARS from 9 am to 5pm Mar. 20th.
The work of repairs make noise.
We are sorry for the inconvenience.